The Next Edition
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate
No Result
View All Result
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate
No Result
View All Result
The Next Edition
No Result
View All Result
Home Headline News

Lagos-Ibadan Expressway: Rain Stalls Kara Bridge Structural Integrity Test

Next Edition by Next Edition
June 29, 2020
in Headline News
0
Lagos-Ibadan Expressway: Rain Stalls Kara Bridge Structural Integrity Test

Kara Bridge

0
SHARES
0
VIEWS
Share on FacebookShare on TwitterShare on Whatsapp

Mr. Kayode Ibrahim, Deputy Director Highways, Federal Ministry of Works, Lagos, said that heavy Sunday morning rain stalled completion of the ongoing structural integrity test on Kara Bridge on Lagos-Ibadan Expressway.

Ibrahim, representing the Federal Controller of Works in Lagos, Mr. Olukayode Popoola, said that the rain forced workers to stop work.

“The rain did not allow us to work. It is raining profusely here and we had to suspend action; hopefully, we would have a clear weather tomorrow.

“We have already carried out some tests and the results so far have been positive. The bridge is still intact.

“The test done so far did not indicate that the fire affected the bridge. It is just the surface.

READ ALSO: FG Shuts Kara Bridge Along Lagos-Ibadan Expressway

“We will finalise tomorrow because the rain did not allow us to conclude. The tests done so far show that the bridge is still very much intact,’’ he said.

Ibrahim said that the structural integrity test was more than 50 per cent done and with the clemency of weather, it would be completed on Monday.

He commended the traffic regulatory agencies who had been on ground to manage the construction zone for the speed achieved so far.

Popoola had in a statement on Friday announced a traffic restriction on the highway for tests to happen on Saturday and Sunday.

The structural integrity of the Kara Bridge came under scrutiny after an inferno from two tankers carrying petrol crashed on each other on the bridge inward Lagos on Sunday, June 21. (Freedom Online)

Tags: Deputy Director HighwaysFederal Controller of Works in LagosFederal Ministry of WorksLagosLagos–Ibadan ExpresswayMr Kayode IbrahimMr. Olukayode PopoolarainStalls Kara Bridge Structural Integrity Test
Previous Post

Lagos Commission Seals Social Clubs For Flouting COVID-19 Ban

Next Post

Whistleblower: FG Only Pays For Funds Recovered Not Mere Exposure – Malami

Next Post
Whistleblower: FG Only Pays For Funds Recovered Not Mere Exposure – Malami

Whistleblower: FG Only Pays For Funds Recovered Not Mere Exposure – Malami







The Next Edition

Office Address

Riggs Plaza, 2, Ogunnusi Road, Omole Phase 1, Ikeja, Lagos, Nigeria.

Quick Contact Details

Phone:
+234 805 751 1685
+234 803 301 8430
Whatsapp:
08051679910

Email:
[email protected]

Categories

  • Aviation
  • Beauty
  • Breaking News
  • Business
  • Columnists
  • Editorial
  • Entertainment
  • Fashion
  • Featured
  • Football
  • Foreign
  • Headline News
  • Home & Garden
  • Interviews
  • Investigations
  • North Central
  • North East
  • North West
  • Opinion
  • Parenting
  • Politics
  • Relationships
  • South East
  • South West
  • South-South
  • Special Reports
  • Sports
  • Top News
  • Vox Pops

© Next Edition Business Development Limited

  • About Us
  • Advert Rate
  • Contact Us
  • Privacy Policy
  • Terms of Use
No Result
View All Result
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate

© Next Edition Business Development Limited