The Next Edition
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate
No Result
View All Result
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate
No Result
View All Result
The Next Edition
No Result
View All Result
Home Headline News

Edo Power Supply To Improve As CCETC-Ossiomo Transmission Equipment Arrives Soon

Next Edition by Next Edition
January 10, 2019
in Headline News
0
Edo Power Supply To Improve As CCETC-Ossiomo Transmission Equipment Arrives Soon

Obaseki

0
SHARES
0
VIEWS
Share on FacebookShare on TwitterShare on Whatsapp

Edo State Governor, Godwin Obaseki on Wednesday said that transmission equipment, including transformers, cables, supply lines, among others, would soon be delivered from China to boost electricity supply in the state.

The Governor made the statement barely two weeks after his visit to the construction site where the 55 Megawatts CCETC-Ossiomo Power Plant in Ologbo near Benin City is located.

Obaseki said, “the latest information made available to me by those tracking the movement of the equipment from China, said the transmission cables, transformers and other supply infrastructure have sailed out of China and heading to Nigeria.

“I have also been told that work is being fast-tracked on the 55-Megawatt power plant, which is coming from Saudi Arabia, to be positioned for sail out.”

The governor explained that “the current cycle of darkness foisted on electricity consumers in Edo State by the Benin Electricity Distribution Company (BEDC) is killing businesses and ruining social activities,” assuring that a new era was on the horizon with his administration’s bold initiatives.

READ ALSO: FG records 8, 686.6 MW increase, transmits 125,346.4 MW in December 2018

He further said the April date for the commissioning of the first phase (5 Megawatts) of the project was realistic as the project partners were intensifying work on site.

Recall that after a tour of the site last week, Obaseki told journalists that “We believe that before the end of the first quarter of the year, the first 5MW would be delivered to light up government offices and streets within the Sapele Road corridor of Benin City.”

Tags: CCETC-OssiomoEdoPower SupplyTransmission Equipment
Previous Post

Trump walks out of shutdown talks with a ‘bye-bye’

Next Post

World Richest Man, Jeff Bezos to divorce wife after 25 years

Next Post
World Richest Man, Jeff Bezos to divorce wife after 25 years

World Richest Man, Jeff Bezos to divorce wife after 25 years







The Next Edition

Office Address

Riggs Plaza, 2, Ogunnusi Road, Omole Phase 1, Ikeja, Lagos, Nigeria.

Quick Contact Details

Phone:
+234 805 751 1685
+234 803 301 8430
Whatsapp:
08051679910

Email:
[email protected]

Categories

  • Aviation
  • Beauty
  • Breaking News
  • Business
  • Columnists
  • Editorial
  • Entertainment
  • Fashion
  • Featured
  • Football
  • Foreign
  • Headline News
  • Home & Garden
  • Interviews
  • Investigations
  • North Central
  • North East
  • North West
  • Opinion
  • Parenting
  • Politics
  • Relationships
  • South East
  • South West
  • South-South
  • Special Reports
  • Sports
  • Top News
  • Vox Pops

© Next Edition Business Development Limited

  • About Us
  • Advert Rate
  • Contact Us
  • Privacy Policy
  • Terms of Use
No Result
View All Result
  • Home
  • About Us
  • News
  • Featured
  • Investigations
  • Foreign
  • Special Reports
  • Entertainment
  • Interviews
  • Advert Rate

© Next Edition Business Development Limited